The Influence of Risk on The Performance Project of Framework Agreement Construction

Authors

  • Habir Habir Student of Civil Engineering Doctoral Degree Hasanuddin University
  • H. Parung Civil Engineering lecturer of Hasanuddin University
  • M. R. Rahim Architecture Lecturer of Hasanuddin University
  • M. Amri Economy Lecturer of Hasanuddin University

DOI:

https://doi.org/10.20956/ijesca.v2i1.149

Keywords:

Risk identification, Framework agreement, construction projects

Abstract

The contract is an important aspect that is crucial in the implementation of construction projects. Framework agreement is one of the model contracts that are still limited implementation in the construction world in Indonesia. This study aims to assess the application of Framework agreement in the construction field, especially from the aspect of risk; it starts from identification to the risk allocation of the aspect of construction contracts. The research is done in the form of a survey by capturing the opinions or perceptions, experiences, and attitudes of respondents consisted of contracting, procurement, vendor, and the project owner. From the results of the study note that the most influential risk level is variable Fossil (X8), Testing (X9), Termination of employment (X16), Delay Testing (X18), handover of some of the work ((X20), Procedure variation (X28), the Right Contractor to Halt Work (X33), the risk of service users (X36), the consequences of the risk of service users (X37) and exemption from the obligation to force majeure (X44).

Downloads

Published

2016-02-02

Issue

Section

Articles